Responsibilities for ensuring that the steps in this procedure shall be carried out at appropriate steps in the procedure: QA/QC : Quality Assurance / Quality Control Engineer. Requirements of Civil Defense or Fire Department.Regulation of the local Electrical Authority,.The Latest Approved shop drawings for the required and applicable areas for the fire alarm and voice evacuation system and shop drawings for the Emergency lighting system.Supply and install the fire resistance cables and devices of the fire alarm and emergency lighting systems for all applications in line with project requirements. This method statement is applicable for installing the fire resistance cables and devices for the fire alarm system and Emergency lighting system in all applicable areas for the Project of the building. 7.8 Inspection, testing, and commissioning.7.7 Fault Finding For Emergency Battery System.7.5 Termination of Fire Resistant Cables will be carried out as per manufacturer's.7.4 Installation of the Fire resistance Cables:.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |